Research carries on apace:
- Visited Rhyd Ddu and have taken over 250 photos of just about everything from every conceivable angle.
- Measured the dimensions of ub114, toilet block and new station building.
- The WHRCL have been fantastic and have let me have copies of relevant construction drawings
- Even cabbed a garratt on the trip!
Other progress includes obtaining the bridge abutments for UB114, getting together switches, CDU etc. Early wiring diagrams have now also been completed.
Colin
No comments:
Post a Comment