The track for the hidden sidings has been laid out, cut and joined. Track pins need to be added yet (it was too late to start hammering last night!).
In other news the baby stuff from the loft has been brought down giving me a full loft to be able to measure ready for erecting Rhyd ddu up there.
A 009 narrow gauge model railway of Rhyd Ddu. The project was born in late 2005. This blog describes the planning, woodwork, track laying, wiring, DCC, scenery, locomotive and rolling stock. The layout is an impression of the Welsh Highland Railway (WHR) Rhyd Ddu station and Tro Ffridd reverse curves. 009 is 4mm scale (OO) narrow gauge using N gauge track.
Sunday, August 28, 2011
Hidden away
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment