- A number of extra feeds were soldered in place on boards 2 and 3.
- 4 x 8mm holes were drilled in board 4 ready for the control panel and the M8 bolts. assembled with washers (2 on bottom, 10 on top - to allow for the panel to slope down) were put together.
- A couple of bits of cork were cut away.
- Almost all the rest of the holes in the baseboards were drilled ready for feeds.
- The buzzbar on board 4 was split into 4 pieces ready to take various feeds.
- We ran out of wire! More was ordered.
Colin
No comments:
Post a Comment