Hi,
Firstly, due to all the fiddling about moving between jobs work on the layout has dipped recently, but normal workflow will be resumed shortly...
The first trial section of modroc was tried today. One bandage worth was placed on top of the masking tape/newspaper balls former and then sprayed with a water mister. Then the water was brushed over the top of the modroc. I have chosen this method as I feel it is least messy, will avoid over-wetting and should be more controllable. One downside is the mist did get onto the rails in some areas. These have been dried with a cloth as I didn't want anything to rust!
All the control panel parts have been moved inside and planning how this will be wired up is a priority job ahead.
Colin
No comments:
Post a Comment