The expong list of layouts has been updated and further info added about traders and socieities here:
http://rhydddu.blogspot.com/2010/08/other-layouts-at-expong.html
A 009 narrow gauge model railway of Rhyd Ddu. The project was born in late 2005. This blog describes the planning, woodwork, track laying, wiring, DCC, scenery, locomotive and rolling stock. The layout is an impression of the Welsh Highland Railway (WHR) Rhyd Ddu station and Tro Ffridd reverse curves. 009 is 4mm scale (OO) narrow gauge using N gauge track.
The expong list of layouts has been updated and further info added about traders and socieities here:
http://rhydddu.blogspot.com/2010/08/other-layouts-at-expong.html
The headshunt has been cut back, turnout positions marked at holes drilled for frog wires and point machines. Further filler has been added where the cork base was stripped away. I’ve also added rail joiners where I can, but have found to be 6 or so short of the conducting variety. These should arrive by post today. Once they arrive track relaying will commence, followed by wiring and testing, then ballasting and painting the track and finally the reinstallation of details. simples.
Firstly, I spent a while last night drilling 1.3mm holes (12 in all) into 87’s boiler for washout plugs – here is one shown test installed. Also attached were steps on the other side plus the large ejector casting ready for the pipework.
Then I got on with the job of stripping out the pointwork on the yard board (for the second time) and looking at how to arrange the new, longer, different angle turnouts. There is good news – no need to change any of the board joins, but of course all the holes for the point machines are in the wrong place!
and from the southern works, 138 is making good progress, here the tanks are basically finished. Lubricators are to be added (once markits have delivered them), but otherwise they are done.
Here is the first board join bolt set for the transitions between hidden bits and scenic bits. The 1.5mm OD, 1mm ID brass tube will be soldered to the rails and the 1mm steel bolts used to plug into these tubes and make the join line up. Thanks to JdF of county gate for the idea and to eileens for stocking the materials – the albion alloys stuff you get at most model shops is no good as the wall thickness is too great.
Found an error in the SAR brake which I had not noticed before – one side is etched correctly, the other has three blocks of windows that now don’t exist and one extra window to be added. Here we see the three blocked up with filler after a plasticard section was added behind (final sanding required before its finished) and the new window filed square from three small holes made into one blob with a piercing saw.
The post today brought some fun: copper wire of varying diameters for loco detailing and…
washout plugs for the NGG16s:
The peco mainline points have been attended to for DCC friendliness:
and some filler added to the primed roof of Vale to hide the blocked up holes better.
Finally Dolgarrog was finished (although some light weathering will be applied too when the airbrush is out):
Wedding in Tadcaster, 2 hours to spare – do we hang about the wedding venue trying to keep the kids amused, or find something else to do…ummmm I wonder…?
Here’s some shots of where I’m up to on the B wagons. The handrail jig (bill bedford) is excellent! The trial footstep is on wagon 3. You will note that not all the wagons have a full complement of the small handrails, and that is as per the prototypes.
I also gave Dolgarrog an initial coat of paint – blue and black on the body, red on the buffer beams and yellow on the handrail.
Painting of the funkey in Gloucestershire has progressed very well indeed:
and in Warwickshire, I’ve been drilling holes in the B wagons to take the tiny hand (foot?) rails to finish off the B wagons (and the ballast wagons need 8 handrails too). My 0.45mm drill however was very difficult to use in the pin vice as I couldn’t rotate it fast enough to ensure the drill didn’t get stuck. After a few attempts at putting this tiny drill bit in various drills etc I thought of putting the actual pin vice in my bosch drill – brilliant – works perfectly.
70 odd holes drilled out.
Did some research on the layouts that will be with us for expong (more may yet be confirmed):
Ardez HOm - http://www.flickr.com/photos/fairlightworks/4510640543/
Belgian Country Tramway (1:50 scale, 18.2mm gauge) - no details on web available
Black Hall sidings (O-9) - http://stevebennett.fotopic.net/p44224935.html
Cwmfelinfach 7mm 16.5mm gauge - http://www.staffordrailwaycircle.org.uk/layoutscwm.php
Fen end pit - http://homepage.ntlworld.com/david.barham/fenendpit.html
Feltwell road 009 - http://www.flickr.com/photos/fairlightworks/4511343214/
Helford Valley Railway - Gweek North Quay (O-16.5) - http://www.fmrc.co.uk/c_layouts.html
Johannnesdorf 1/45th 7mm - http://www.smithslayouts.com/page2.html
Koonunga Junction On30 - http://www.youtube.com/watch?v=KhT52acv3NM
NG sand and gravel - http://www.youtube.com/watch?v=0TtuZ_GPrlo
Paradise mining co. 1:25 - http://www.jackymolinaro.com/reportages/Amis/PMCO/PMCO2.htm
Picture this O 16.5 - http://www.uckfieldmrc.co.uk/memberslnf.html
Punta marina - http://www.009.cd2.com/images59/2.htm
Quahog Lumber Company On30 http://ngrm-online.com/forum/index.php?topic=2361.0
Rae Bridge 009 - http://www.009dutch.nl/main/pages/erae%20bridge2.htm
Twin Falls Logging & Mining railroad On30 - http://www.youtube.com/watch?v=QAe3aN8-hew
Uivernest 009 - http://www.009society.com/uivernest.php
For completeness here are the trade stands:
Societies
Firstly we’ve visited two miniature railways, both recommended at nearby country parks. The Echills Wood Railway is at Kingsbury Water Park and is a superb run of over a mile. The odd engine shown above bears a kind of resemblance to the funkey ‘Vale of Ffestiniog’! The other is more of a standard miniature run at Ryton Pools – a green class 37 this time.
I’ve also managed to wire up the question mark board with it’s 4 feeds now attached to the track and the bus. Furthermore the ends of the bus wires have had their connectors added and all is good.
Last night I decided to have a play with greenwich couplings (well expong is organised by these guys and gals). I found them excellent to fold up and use as simple loco couplings and extension backwards with three mounting holes should make them great for adding to brass bodies with just a vertical wire inside the ends. The black colour is how they come – ready blackened!
I then tried to make one up into the full coupling. I didn’t need the magnetic uncoupling and was aware that the extended leg would catch on the exit from the down gradient on the layout, so I snipped this off. However this means that the very small and light loop doesn’t like to return to the normal position, and so I have decided to give up on that one and just use ordinary bemos. However I think they are well worth using as loco couplings.
I also ordered the 4 new peco mainline points I need, and to pay for these and the NGG16 I bought, a few items have been added to ebay:
http://shop.ebay.co.uk/colinlea009/m.html?_nkw=&_armrs=1&_from=&_ipg=&_trksid=p4340
Hotfooting from North America, here is NGG16 No. 140. She will stay in the box until the real 140 appears, or if that appears unlikely and 143 gets a repaint (soup orange or green?) then I might outshop her as an alternative 143).
A quick rundown after an initial look reveals:
- all valve gear riveted together and stored safe
- both tanks constructed with rivets filed off, oil tank for rear bunker
- body partially complete including boiler bands
- mars headlights included
- one bogie complete except for valve gear, but motor installed, gears working. but two wheels are loose on their axles – the curse of the dreaded plastic centred wheels continues! The other bogie is not started, but the cranks have had their pins installed and all 4 sets of pony trucks have been assembled
- all other details present
So, my NGG16 roster (not all for expong!) is as follows:
143, black with welded tanks
138, red with welded tanks
87 – blue with rivetted tanks
109 – lined black with welded tanks
140 – red??? with welded tanks
- woodwork – new breakfast bar style legs need installing and new board covers need building. Mostly done, board covers just need velcro now.
- trackwork – hidden sidings transitions need installing, work is needed to finally align board joins plus the installation of track in the new station approach point area some progress but decision to relay yard points (again) means extra work beyond that planned.
- pointwork – test tortoise. done, but see above.
- backscene – order mirror vinyl for ends, check backscene test print, if ok get printed on vinyl and install.
- electrics –reconnect up a few feeds to new improved bus, carry through bus to hidden sidings. connect up feeds to hidden sidings storage area. in progress
- hidden sidings board alignment – do magnets work? in progress as above
- Curtain around layout base – add velcro on layout. awaits layout being fully erected
- scenics – tart up board joins, add signs and details. Extra trees to hide any backscene issues. left to end
- carriages – much progress, but bogies need couplings adding, glazing needs installing, some grab handles required plus ivory touch-up and transfers
- wagons – painting plus couplings etc. Some extra work e.g. handrails to Rob’s excellent ballast and DZ wagons. hardly any progress here except that delivery of Rob’s wagons took place
- check van size as my calculations reckon we will need a LWB transit. done, but finding such a van locally is proving to be difficult
- locos
1) 143 – done in black and just needs a decoder and tanks varnished
2) 138 – Dad has begun painting chassis and detailing body
3) 87 – body detailing in progress, chassis with Dad
4) K1 – no progress
5) Castell Caernarfon – really getting there
6) Vale of Ffestiniog – basically just needs painting now in it two tone green livery.
7) Merddin Emrys – needs pickups adding and lining, plus decoder. Should be easy.
7) Russell – with Dad to finish electrifying and then ready to paint.
8) Upnor Castle – body to chassis link basically done, many more details added, coming on
9) Taliesin – built by me and nearly ready, at bottom of list though due to pressing priorities above.
10) Gelert – needs painting and conversion to DCC may be tricky due to live chassis.
I was able to do 90 mins more work to 87 this weekend..with many holes drilled for things like steam pipes and handrails and a few bits fitted too.
On the layout, I did a little wiring on the new question mark board and have set up all the necessary tools in the garage ready for a final wiring sortie in the next few days.
I’ve also bought another NGG16(!) but more on that when it arrives from abroad. Finally test running of Gelert has proved to be a success – with a little oil and a bit of running she’s a beaut.
20 more liliput bogies arrived today and wheels have been duly installed/swapped such that goods stock will use 6mm wheels and passenger 7mm. The 8mm wheels which were slightly out of scale are being sold. For the record the greenmax and parkside FR bogies also use 6mm wheels.
I now have enough bogies in stock for all my stock. Hooray!
Now that baseboards are stored away again, the desk can be returned to normal!
Progress has been concentrating on the bogie situation, with a decision made to standardise on:
- parkside dundas FR pattern bogies for all FR/WHR/NWNGR heritage stock
- greenmax DT21 bogies for all modern FR stock
- liliput bosna bogies for all WHR(C) stock including wagons.
This means that my stock of vale of rehisol bogies, worsley FR short and long, worlsey SAR pattern and rocobogies will soon be sold, together with a bag of pointless curved spoke wheels.