Another wet day but the post duly delivered 4 new mainline peco points. These were converted to dcc friendly over lunch in the usual way and the springs were removed.
All handrails on the B wagons, the ballast wagons and the SAR brake have been added and the vent on the roof of said brake added too. These are all now ready for the red oxide primer once the weather improves. The bogies fit as is and so couplings are already done.
Dolgarrog got a second coat too.
No comments:
Post a Comment