Those promised images:
Firstly here is the maze of wiring underneath the yard board - all wired up and ready to go.
On top it looks like this now, with road markings in and spot reballasting continuing. I have however run out of railmatch 'sleeper grime' so there will be a short delay before this board is finished.
The station board just before it was removed to the garage - the JCB cost an arm and a leg! The flower beds and station planters are glued in place, as is the fencing. Final details such as water tanks(!), signs etc will come later.
No comments:
Post a Comment