It’s been a busy week and I’ve driven many miles so little modelling has been achieved :-(
However I did, after tennis, manage to install the first two breakfast bar style leg bases on a board and prepare two more for installation at lunchtime today.
After the first lot of ballast was dry, I also spot reballasted the new point. Here Gelert is inspecting progress.
and it looks like the AZ ballast and DZ wagons are complete:
http://bostonlargsworks.blogspot.com/2010/08/in-pipeline.html
Thanks Rob! Super job.
No comments:
Post a Comment