Sunday, February 22, 2009

where in the world?

I didn't expect to find this today - right next to the National Space Centre in Leicester is the Abbey pumping station, which has a small 2ft gauge railway (not operating today - boo hiss).  A piece of Wales (well FR 2 ton slate waggon) in our backyard!

Anyway, Shepton Mallet was good fun as ever.  The exhibition had a number of excellent layouts which kept me amused.  My favourite was a toss up between Borth y gest and Tan y Bwlch, with the former just nudging it based on the smoke effects and scenics, but it was close.  See the link in yesterday's post for images.  I really fancy a gravity slate train - an arnold kof chassis in the 4th waggon (a larger 3t variety) is the trick apparently - but how to make it DCC?  It might have to have the decoder in the 5th waggon!

The 009 sales stand was good and I picked some up good bargains in the way of waggons, books (Boyd's* NG railways in Mid Wales for £10!), bogies, plastic kits and oddments.  Almost all of these have been up to standard once I got them home for a proper look, but three carriages have made their way back to ebay, as they are not up to the standards I require.  

Before the event I had made a survey of all carriages and the bogies I had in stock.  I found I was short of FR short pattern bogies by about 6 pairs.  At the 009 sales stand there were a number of unopened FR parkside bogies at a good price - I counted them up and there were, you guessed it, 6!

At the worsley stand there was more good news - the 2008 changes to FR 116 meant a new kit and I now have a one-off kit that Allen did for me - plus I picked up some Mark 2 quarryman's carriages and a NWNGR brake comp no.1.  116 has already had its pieces cut out ready for soldering to begin.

Afterwards I made my usual pilgrimage (this year only with my brother as the rest of the family were unable to make it this year) to Cheddar for mini golf, cheese, onion marmalade, firebox ale and chocolate trout (don't ask) followed by a trip to Thatcher's cider farm for a 5 litres of real cider straight from the barrel - and only £6!  Afterwards we checked out the fire ravaged pier at Weston before hitting the M5 north again.

Colin

* It was also noted today that the genius Mr Boyd had passed away.  RIP sir.

Saturday, February 21, 2009

Tuesday, February 17, 2009

carriage progress

I mentioned a project to create a 39 or 42 Hudson toastrack from a parkside kitbash. This is how far I've got - the old side is visible cut out and the startings of the new side (utilising the old underframe and cant rail (not attached yet) is below it. The ends have had the detail filed off.

If you don't know what carriage I'm on about check this out: http://www.frheritage.org.uk/wiki/Carriage_39

and, following a delay in getting 188 strip from modelex, I have started work on FR service car 124, which always runs with 100.


Colin

Monday, February 16, 2009

Quick update

Some quick titbits:

- Bogies for the 3 other B wagons have been completed - SAR pattern from worsley works with brass bearings.

- A project to try and kit bash a parkside kit for 37/38 to resemble a Hudson toastrack (39 or 42) has been commenced - the kit gives me the chassis, underframe, roof and ends (although the ends need false planking adding), the sides will be scratchbuilt using the method I've used for 100 (aka the Rob Waller method).

- I've run out of sleeper grime now (more on the way, don't fear) - but one loop road has been finished.

- The trees installed with brown trunks have had grey dry brushed on to tone down the brown (tree trunks ain't brown!).

- I've also tidied up a load of bits to ensure I can get to important details like vac pipes, couplings etc without having to wade through piles of other stuff first.

- The last few details necessary to complete on the WHR funkey, mainly footsteps have been folded up reday for a final assault on this model asap.

- The new WHR 2009 timetable sees just about every move possible at Rhyd Ddu during 2009 - short trains terminating there early in the year, trains passing, single trains running through without passing etc and with a mix of steam and diesel too. Great!

Colin

Friday, February 13, 2009

What it's cracked up to 'B'

Some progress to report.  Firstly, as you can see above the first B wagon has been completed to the level where it can be painted.  Dad had completed the fiddly angles on the sides a while ago and I've added the details, strapping etc.  It even has lead weight added already!  I have another 3 in stock, I'm just trying to summon up the courage to have a go at that angle myself (without Dad's resistance soldering kit!).

I've also put together 2090 the WHR brake saloon (despite the risk that it may change as it's in the works at the mo), ordered some extra plastic strip I'll need to build FR No. 124 and also completed the new No. 12 (Van 5) seen in bits in a previous post.  The old one (window spacing was wrong) sold on ebay a few days ago.

On scenics, the Ffridd Isaf board has had its track treated with the sleeper grime to match the adjacent board and the underbridge has had another coat of 'concrete'.  However the smell of the railmatch paint seems to be lingering and getting into the house, so I have to be careful here.

The platform lamp columns have been tested with DC and AC to see which is best - controlled DC certainly gives a better light and allows dimming, so a cheap hornby controller will be used for this and also to supply the 15v AC out required by the points decoder (the famous 99p off ebay H+M has been relegated due to concerns about its electrical safety).  The bits are in stock to complete all the wiring (an evening frankly), but I'll wait until the weather improves!

A load more Lilliput bogies were purchased from my supplier (I only know of one place you can get them and he only has stocks every now and again).  Parkside (romford) 8mm diameter wheels have been added to them and they run superbly.  This means that all the new WHR carriages will run on these bogies.  

Scale link benches have arrived and 2 of these are being fabricated, whilst a plan of the platform area has also been drawn up.  As my platform cannot be scale length, I have to decide which features to include and which not to, whilst maintaining the correct look and feel.

I have bought a few test pots of hornby acrylic paint (also in photo above).  Once a brass vehicle is primed, obviously you could use acrylic or enamel paints and acrylic is somewhat more palatable for use indoors (although it definitely needs a coat of lacquer/varnish afterwards to avoid chipping) and I plan to use more of the acrylics.  I also like the way that errors can be corrected immediately and easily with just water.  I understand humbrol are phasing out enamels altogether anyway.  

I'm sure Dad is most amazed by this as, being an artist of some renown, he can mix any colour from just a few base colours, but I haven't got that knack and would also be concerned about keeping a consistent colour when a lot of paint is needed, so a pot of a certain colour is preferable (they're pretty cheap anyway).    

Shepton Mallet is just a week away and there is as yet no sign of the imminent arrival of the baby, so fingers crossed, I may yet make it.  

Colin

Monday, February 09, 2009

By popular demand...

Regular commenter Tom asked for more scenic progress, so here the digger has been at work preparing the level crossing. But seriously there has been some progress...


Firstly, the wendy house nears completion with the addition of finials and even a doorknob! There is a bell to go above the door yet and a sign at the other end attached to the gable saying 'ALLAN' - exit in Welsh!
Regular readers may also remember an experiment I had with 'bracken', this has been covered over with more appropriate material - flock that was chopped off the Faller trees. The area behind the bridge has also been sorted with a new ballast based footpath bed added.

Friday, February 06, 2009

Any post was there, perchance?


The post just arrived - firstly Pete of Backwoods miniatures has been very kind in sending me some extra parts to add to the Taliesin kit.  The kit was produced just before the engine appeared out of Boston Lodge, and as appears customary, the Blodge made some changes to that shown on the drawings.  These parts will help to put that right.  Thanks Pete.

Secondly some very useful bits arrived too - curtains and table lamps for the Pullman car, finials for the wendy house and grab handles for carriages.  The finials finally solve a long running problem with sourcing such things!  Hooray.

Colin

Wednesday, February 04, 2009

We have a box

Well, as promised, the sides were tidied up and put together into a box.  The banana sides caused by the lamination are clearly in evidence!

So, the next job was to cut a piece of 60 thou (yes a thick mumma!) as a floor and fettle it until it fits snuggly.  I'm really pleased with how this has turned out.  I have however been a bit hasty in putting this together, forgetting to drill holes for handles etc, but then there aren't many doors on this one anyway (there are just 2).

Most of the minor errors I've made won't be visible from afar and so I think I'm going to continue on with this construction method (once I've added the floor holding pieces, the bogie centres and a false roofline) to No. 124.  100 and 124 always run together, so its a bit pointless having one and not the other!

On the brass carriages front, Allen of Worsley works has today confirmed that a new model of 116 will soon be available - this carriage was altered last year to have equal window spacings, where before it had a separate first class section with different windows at one end.  With a fair wind, he may also be able to produce the SAR DZ wagons too.  If you want some - drop him an email to encourage him!  The WHR has 4 by the way, I think only 1 of which has been overhauled so far.

I've also started work on a replacement for van 5 - I had mistakenly bought an incorrect (1962) version of this kit and only after completing it did I realise that the window lines had changed.  The new kit is in bits below, the old one is on ebay here:
http://cgi.ebay.co.uk/ws/eBayISAPI.dll?ViewItem&ssPageName=STRK:MESELX:IT&item=110347023745


and finally when I had a moment in between sorting No. 100 I converted two Talyllyn 3 bar slate wagons (rodney stenning kits) to resemble FR wooden framed slate waggons.  The painted one is how they will eventually look.

Happy days

Colin

100 progress

Further progress last night - the second side of 100 has had its top, bottom and side rails added and the door had its top edges started.  Today I have added all the verticals and hope to post later to say that both sides are ready - the horizontals are yet to be done.

I also fabricated the rear end, using the compass cutter to create the radiused top edge and cut out a window to represent that in the rear door.  

Colin

Monday, February 02, 2009

Much to blog about

PART ONE: Progress on FR carriage 100.

I am preparing to complete the second end, using a compass cutter to create the radius at the top.

The first side has had its second stage detail almost completed.  It's hard to take an image, so here's one which has had its contrast maxxed up in photoshop.  The banana bend is normal apparently, caused by the lamination.  Most of the strip is 15 thou by 20 thou.  It's not perfect, but for a first go I'm quite pleased with it.

PART TWO: Plans for second side of the layout - or what shall I use my 2 new 4ft x 2ft baseboards for?

I've been thinking about this a lot.  One of the new problems with Rhyd Ddu is that, with most FR stock (and any heritage WHHR trains) terminating at Beddgelert, I'm stuck with just being able to run WHR trains.  Luckily some of the timetabled trains do indeed pass at Rhyd Ddu, so that's something.  So, I was looking to make the second side of the layout into an area where the other stock I'm building could be used.  The obvious choice is therefore something south of Beddgelert.

One thought was Pen-y-Mount.  Here I could model all the mainline WHR trains (current WHR stock and the FR third set trains too).  Indeed the WHHR stock can also be used (whether they run past Pen-y-mount or not) and even the Cambrian if I chose to model Cae Pawb as well.  This could be the usual DMU stock, but also class 37s and even steam specials.

However, the flat crossing may be a problem: to quote from Brian Meldon on the 009 society forum:

"the ready made standard/009 crossings that I have seen have dead frogs...This makes it virtually imposable to achieve good running on the 009 track. The gap in the rail is also a problem as the 009 wheels will tend to drop down in to the space required for the standard gauge flanges. You could always build one yourself but even then the gap required for the standard gauge flanges can be a problem.

One way round this is to only use fine scale 00 wheels with tiny flanges and build your entire 00 track and all the 00 locos and rolling stock to this standard. 
On real railways the difference between narrow and standard gauge wheel flanges is quite small and crossings, like that installed at Porthmadog in the photo linked below, have very small flange gaps:
http://www.isengard.co.uk/images/JPEGS/S14_NF2-11-06Cambrian%20Crossing.jpg

This is not easily achievable in 4mm scale and certainly not using ready made crossings. A 90 degree crossing is not a good thing at all because both wheels will hit the gap at the same time, on the real railways these are normally avoided as is the case at Porthmadog, by being on a slight angle. At the other extreme crossings at acute angles will increase the length of the flange gap and the resultant hole." 

Ummmm...doesn't sound hopeful really.  I'm going to talk to a track guru first, but it seems a bit unlikely.  Also I'd need to build the unusual catch points and some method for running standard gauge trains at 90 degrees to the narrow gauge and then folding back to sit alongside the back of the baseboard on both sides.  It might make the baseboard impossibly wide?  

So, other possibilities...?  I still like the idea of 2 or 3 scenes on this side, with Tyler's curve and Plas halt a major contender for the first section, partly as the curve is correct.  The other contenders are:

- Tafarntrip and Garnedd tunnel (tunnel at end is useful for scenic break, bit boring?)
- Barlwyd Terrace near Tanygrisiau (river and rhodos are lovely here plus gentle curves)
- Aberglaslyn (obviously wonderful, but how to model to make the scale look right - the hills at the back are huge)
- Rhiw Goch (provides a passing place, but might also be a bit boring)
- Dduallt tank curve (a lovely gentle curve with interest (old tank))
- Nanmor bank and Nantmor cuttings (gradient, rock cuttings, road bridge)
- Nanmor river bridge and Hafod y Llyn loop (Hen Hafod).  -  see below.

PART THREE - Hen Hafod

and then yesterday came the announcement that the WHR will open to Beddgelert on 7th April and will be extended to a temporary terminus at Hen Hafod (old Hafod y Llyn and just short of the river bridge) on 21st May. 

The line will not now open to Porthmadog until after the summer peak season.  

So, the question now is what will happen to the third set of FR carriages?  Will they run on the FR as in 2008, or will they be used on the WHR.  If so, will they run a shuttle from Beddgelert, or Rhyd Ddu/Waunfawr or even Dinas/Caernarfon?  If so, then Rhyd Ddu will see the use of the FR stock after all!  

We'll have to wait until that becomes clear...

Colin

Thursday, January 29, 2009

Second stage



This is part 2 and is a catch up to where I am now. Both sides have been completed to the initial stage, with the blanking panel added too. The front obs end has also been fabricated. Next stage is the rear end and then to start adding the beading etc
Colin

A plasticard project

Above is the result of my first foray into scratchbuilding carriages using plastic.  I have to say that I started off sceptical.  How could a carriage like this be strong enough?  Isn't it just really fiddly?  I had read a couple of articles in the model railway press on this subject and I still favoured etched brass.  

So why have I started exploring this method?  Well a few things - firstly getting drawings of three FR carriages (100, 102 and 124) was really difficult - even after contact with fairly high up FR people, I was only able to get a drawing of 124 (and was explicitly banned from passing it on to a commercial kit manufacturer), 100 and 102 are elusive to this day.  So that meant etched brass was probably out unless I drew my own drawings from known dimensions and photographs.  ouch!

Then I was contacted (about another matter actually - bogies) by Rob Waller and we got chatting...he (rather splendidly as mentioned previosuly) offered to give me a masterclass on his methods for building in plasticard.  However he lives in Scotland, so a face to face meeting was going to be a problem. Over a few weeks he wrote an 'e-masterclass' for me , covering all areas of this construction method from sides to floors, roofs etc.  Armed with this I thought I would give it a go (and frankly it would be rude not to at least have a go).  

The first carriage to be tackled is FR 100, similar to the old 100 (of which I had a drawing).  Only a few changes are necessary and Rob was again very helpful here.  

So, the image above shows my first carriage side.  A drawing is taped to the underside of a piece of glass and evergreen styrene strip has been used to build up the basic structure.  Next will come the beading on top which will give it more strength and the depth of detail necessary to look believable.  

I made a few mistakes with this first side, but what I quickly learnt was that most errors can be sorted pretty quickly and painlessly.  Hardly any error is a total disaster.  You also really only need minute drops of plastic weld (or mek) to join the pieces.  Any more and it seeps underneath and bonds the side to the glass!  But even if it does, that will be the inside face anyway, so who is going to see that?!

So, a massive shout out to me man Rob, and hopefully within a short time I'll have a model of 100 to add to the collection.  After that it's 102 and 124, to be built the same way.  Then of the FR/WHR bogie carriages I only need to complete 26, 118, the new 116 and the new 2010 and 2100.  I expect to be able to get etched kits of 26 and 118.  The new 116 could be tackled either in brass or plastic...

I'm also hopeful that 2090 (in Boston Lodge at the moment) will come out looking similar enough that the kit I have in stock will still be OK and then we have the spectre of the new FR 103 (a wooden frame in the carriage works at the moment), the porthole bug box in a similar state at the moment (kit in stock) and eventually a replacement for FR 121, planned according to my sources.

All jolly good fun!

PS in the image it may not look like everything is square - that's partly the camera angle, partly shadow and partly the fact that parts aren't lying perfectly flat at the moment - with the extra details this will help flatten it out.  It's all square really!

Colin

Tuesday, January 27, 2009

weekend work

So, as predicted, this last weekend two new 4ft x 2ft boards have been constructed for the FR side of the layout using the wood I 'had' to purchase to enable the construction of Thomas' 'layout'.

I even found room in the centre of his 5ft x 3ft layout for an N gauge 'test track' for running in new mechanisms - this is powered by either connecting two croc clips to the 00 tracks and using Thomas' controller, or by clipping them direct to my DCC controller. Sorted.

TK maxx have been selling off Bachmann underground ernie stock cheap (Thomas loves this series) - so a model of 'Victoria' or 'Hammersmith & City' which was £35 was snapped up for just £5! bargain. They run well on the new layout, although H+C is marginally quicker than Victoria much to Thomas' amusement.

Colin

Wednesday, January 21, 2009

Wendy house nears completion

The roof is on, central tiles (obviously to be painted grey) added and all set up now ready for the soffits etc Nearly there. Colin




Tuesday, January 20, 2009

Where were you...?

When the first black president of the USA was sworn in?

Me, I was down Jewsons mate.

------------------
News update

Thomas' oval of OO track has taken a battering by being put up and taken down so many times, so we decided it was time to mount it on a baseboard.  Measuring it up, I needed a piece approx 4ft x 3ft.  Now that's a 'problem', because sheets of ply are sold in two sizes - 4ft x 2ft and 8ft x 4ft.  

Obviously, I needed the larger size.  Why Jewsons - well 8ft x 4ft won't fit in the car, but they offer a free cutting service (unlike travis perkins or the local homebase).  So what to do with the other 4ft x 5ft? Obvious really - get the guy (Alan) to cut it into two more 4ft x 2ft panels leaving a single 1ft x 4ft piece left over.  Got my drift yet?

What that means is that I now have 2 of the 3 baseboards that I need for part 2 of the masterplan - the FR side of the layout.  cool eh!  If I make do with the third baseboard being just a foot wide, then I have all of them.

Even better is that this weekend I have been tasked with building the 2x1 frame for Thomas' layout, well it would be rude not to do the frames for the other boards at the same time wouldn't it?  I might even build some more trestles!

OTHER NEWS

The bases for the Beddgelert end water tower that were found to be too wide, have been sawn off and the ballast replaced.  I just need to blend in the colours with the weathered ballast around it and it's done.  

The wendy house has had its internal partition added (with the hatch detail added) and the slate roof pieces have been cut from that far too thick and difficult to cut wills sheet.  Now all that is needed is for all the bits of the roof to be assembled.

I have given up waiting for drawings of the new 100 and 102 to appear and have found (thanks again to Rob Waller) that these vehicles are actually very similar to the old 100 (of which I have a 7mm to the ft drawing).  Now to shrink it in the photocopier and I can get on with that project. 

Colin

Saturday, January 17, 2009

Giga post

Hi,

Lots of things have been happening, so here's a mega update. Firstly a good friend of my Dad allowed us to borrow his rolling bars and today we set about rolling the roofs of every carriage, planned carriage and loco roof I could find. I counted them later - 59 separate bits of brass! This is a massive step forward and, with the pre-cut strips from metalsmith too I have saved loads of time here.


As I alluded to in the last post, I am starting out on a project (with guidance from Rob Waller) to scratchbuild some Ffestiniog carriages from plasticard evergreen strip. Today at the Leamington model show I picked up some strips of the necessary sizes. I also found myself a compass cutter and some plastic weld (which could well be better than the mek pak I have used up to now). Game on.


So, the Leamington show then. I picked up a flyer a while ago from a local model railway shop. It had a map on the back of it, but frankly it was useless other than to tell you the approximate location - it didn't even tell you which junction on the A46 you needed (there are multiple junctions for Kenilworth/Lemaington! Looking at a road map, we headed for the National Agricultural centre (which had decent signage to it). Once in the site there was a bit of signage showing you where to park within the huge site, but we then struggled to find the entrance to the hall. A bit more thought would help here for those who are not used to the local area.
The entry price was a bit steep I thought (£5) and the secondhand stall was really disappointing - secondhand prices at close to the normal price of a kit new! Why risk second hand? Maybe that's ebay's fault - pushing up secondhand values?
On the narrow gauge front, the wonderful Fallgate was there (images below). This was its last show at the hands of its creator and it will be for sale in the next 009 news. A price of about £1,100 (stock is included and valaued at £700 which won't be separated from the layout) was noted. A super little layout if you can afford that kind of wonga in these 'crunched' times.

Trade support was good - squires, modelex, green scene, rural railways, castle trains, classic train and motor bus, C+L finescale, books, DVDs etc etc Other layouts were generally good, Hungerford stood out.
Back at home, the wendy house has had its sills added and has been put together into a basic 'box'. This gave me the opportunity to take some shots of the layout fully erected (even including the triangular piece) and with some new features added. I have also completed the ramp at the far end of the platform and painted it.




I also trial fitted the Beddgelert end tank. The bases didn't look right and now, having looked at photos of the real thing, I find that the bases are much slimmer than they are shown to be on the CAD drawings. So, the actual as-built on the ground is very different to the plans I have - oh well. I'll have to take a saw to them (ensuring that the legs of the water ower are central on the bases and then reballast around them.

Colin

Thursday, January 15, 2009

Further progress

The wendy house is fast coming together.  All sides have now been laminated (30 thou backing on 40 thou board/batten and they are now ready to be butt joined together.  

The ends have been cut out to fit around the door / window and the roofline has been cut ready. Sills need completing and the internal partition cut out before it can be all put together.

Below is the progress last night, the sides just propped up against each other.

Colin

Tuesday, January 13, 2009

More on the wendy house

Hi,

All the sides of the wendy house station shelter have now been cut out of board/batten and the two front pieces have had their windows added.  I've also started to add the small windows sills too.  The brass door (glued to the plasticard using the wonderful G-S hypo cement) has had a frame added in plasticard strip and the two shelter ends have also been cut out ready - they need shaping to go around the door and end window yet.  

I also made 5 more FR 2 ton slate waggons tonight.

On the cutting mat is some of the brass as delivered from metalsmith this morning - 5m in total of strips 28, 27, 26 or 25mm wide.  Now all I need to do is cut each to the correct length and run them through some rolling bars (I have a plan for this) before they can be soldered on.  Game on!

I also have a plan for modelling the elusive FR brake observation saloons - more on this soon - I am indebted to Rob Waller (of 'Dduallt' and soon 'Bron Hebog' fame) for his time in giving me some fantastic advice (a masterclass) in the construction of carriages from plasticard.  It is fair to say that he has (through some considerable practice given the number of carriagess he has modelled) mastered this technique and I hope to borrow some of this best practice to have a go myself.  Watch this space. 

Colin

Sunday, January 11, 2009

Wendy House and Merddin update

Hi,

Firstly, I have been doing more work on the 'wendy house' station shelter for Rhyd Ddu.  The sides will be laminated from 30 thou plasticard and evergreen board / batten.  This is the setup used by Geoff Taylor, so I thought it sounded sensible.  

However the windows need to be flush with the outer surface, so they are a friction fit against the board/batten sheet with the 30 thou sheet just acting as a stiffener.  Basically the board/batten window aperture is cut smaller and then filed to ensure a snug fit.  

The apertures for the windows in the 30 thou sheet need not be so accurate however and indeed need to be slightly larger than the window itself to avoid showing through. 

The back has been completed in board/batten as a trial and the 30 thou plasticard bases for the other sides have also been cut out (tonight).  The door has been glued to the 30 thou base layer and will have a frame added around asap (thin evergreen strip).  The next job is to complete the board and batten for the sides and ends and then think about the roof - I will be using wills slate sheet for that plus ridge tiles.

Meanwhile at the Gloucestershire works, Dad has completed a necessary alteration to Merddin.  

To enable extra space for the motion, the cylinders have been packed out from the frames. Backwoods do encourage this and apparently this issue was tackled on Taliesin by including this packing within the kit (although it does mean that the kit is not quite to scale).  I would always prefer a slightly out of scale engine though if it means it runs better!  

Images below, the white packing will of course be painted black.  The engine is in the early stages of painting.





Colin

Friday, January 09, 2009

250 not out

Hi,

This is my 250th post on this blog (wow!). However recent progress has been hampered by very cold weather, christmas and colds etc.

However, 4 more trees have been planted on the layout and whilst on horticultural issues, I have been playing with some lovely busch plastic flowers which will adorn the flower beds on the station platform and around the steps from the car park. Below is a shot of the constituent parts of the busch kit:

I have also some good news on the carriage roof front. Metalsmith Ltd http://www.metalsmith.co.uk/ have quoted me for pre-cut long strips of brass. A survey of the carriages found that only 4 widths are required ranging from 25 to 28mm. The brass will be provided at the correct width, just requiring me to cut (with tin snips) to create the right length on a carriage by carriage basis. I need over 5m of brass though! This will save a massive amount of cutting, which without a guillotine would have been a 'score to cut' method (which is very easy to mess up if the steel rule slips even just a little and takes ages too). Happy days.

The latest edition of Model Rail features a good article (although please note that the back to back measurement for 009 should be 7.3mm not 9mm) from Darren Sherwood-Jones on the construction of his Backwoods NGG16 Beyer-Garratt. I have been in contact with him and he is planning a WHR layout too. Maybe he'll start a blog? If you're a member of the rmweb forum (simple registration if not) then some more details are here http://www.rmweb.co.uk/forum/viewtopic.php?f=8&t=22209&p=342021&hilit=whr+ngg16#p342021

Certain carriages remain a problem, particularly FR 100/102/124 and WHR 2010/2100. Potentially 2090 could come out of the works (where it is at the mo) looking different, but luckily I spotted this issue and haven't done much on the current kit anyway. I am preparing to draw my own drawings of these as various FR sources have shown that no official final 'as built' drawings exist.

Anyway, Happy New Year (quite an eventful year I suspect what with the opening of the WHR to Beddgelert at Easter and then Porthmadog in July, plus I expect to become a father once again in March!).

Colin