It seems there is room to accommodate the new peco point, so the old one is out and the new one has been altered by removing the wires bridging the gaps and bonding the stock and closure rails together.
The hole for the point motor needs to be closer to Waunfawr though so I need to drill that out before the point can be installed.
No comments:
Post a Comment