Here the tortoise has been installed with 4 No.4 screws, it awaits testing though.
In the garage last night I finished off the board that is really just a table and added the DCC bus to the Ffridd board having cut out all the unnecessary wiring. The soldering iron is required in the garage before I can move forward there (and I don’t fancy that in the rain!).
The 28 hinges I ordered have arrived, ready for the construction of the board protection ‘covers’ mentioned yesterday.
There is also DZ wagon progress here: http://bostonlargsworks.blogspot.com/ Looking qualitteee!
No comments:
Post a Comment