A 009 narrow gauge model railway of Rhyd Ddu. The project was born in late 2005. This blog describes the planning, woodwork, track laying, wiring, DCC, scenery, locomotive and rolling stock. The layout is an impression of the Welsh Highland Railway (WHR) Rhyd Ddu station and Tro Ffridd reverse curves. 009 is 4mm scale (OO) narrow gauge using N gauge track.
Tuesday, July 15, 2008
Graduation
Friday, July 11, 2008
A quick update
- Lightened the Ffridd Isaf rocks with a white flood wash, which has been very effective in improving the colouring.
- Finished off the rear of the stream bridge with filler on the edges of the walling.
- Finished the application of hairy carpet felt over all boards. A few areas may need some extra where gaps appear after trimming, but that is phase 2.
- Smashed to pieces bits of slate to create smaller bits (scale size)
- Taken up the disappointing slate path (which still hadn't dried underneath after about a month!), this has left a nice base though and a new method for the path is being considered using the above mentioned bits of slate
- Re coloured the Pitts Head road a lighter grey with talcum powder to add texture (I promise this is the last time I'm going to repaint that!).
- Added further small talus around the rocks, clogging up my spray bottle in doing so.
Colin
The world's greatest model shop?
http://www.spmodels.co.uk/ Thursday, July 10, 2008
watching paint dry
and further attempts are being made at Larch modelling... using woodland scenics tree kits, I cut out most of the branches, leaving just single branches (they were split into threes) at intervals, then cut to pieces off a ridiculous model of a larch bought at the World's greatest model shop (more on that tomorrow).
Tonight I have literally been watching paint dry (assisted by a hairdryer) whilst I sprayed these white metal trees, first with grey cellulose primer and I then added brown and a hint of green with spray enamels from B+Q (see below).Then I'm going to glue on the larch branches I removed.... more soon.
Colin
Monday, July 07, 2008
Norfolk break
Saturday, June 28, 2008
carriage seating - solved
Top job and only 50p each including making the mould and P+P. It's all good.
Colin
Monday, June 23, 2008
Further progress
Friday, June 20, 2008
Hitting the ground running
Tuesday, June 17, 2008
some things work, others don't
- Adding the final few rocks and boulders around the layout
- Adding larger debris to the stream (these are real stones liberated from the Glaslyn!)
- Colouring the main rockfaces using a variety of pigments leopard-spotted on
- Mixing railmatch LNER Doncaster green with 24 parts thinners and colouring the carpet underlay
- Adding more underlay to parts of the Ffridd Isaf board
- Smashing up pieces of slate into a million bits and then affixing to the Fridd Isaf board to create the slate waste path
- Creating the Ffridd Isaf access track from ballast attached with scenic cement and a mix of stone grey/concrete colours
but less good:
In attempting to finish the main roadway alongside the Pitt's Head straight, I painted enamel grey onto the road and then added talcum powder on top to lighten the colour and give a slight texture. Sounds good.
Well after getting most of the garage covered in talcum powder I brushed it off to reveal.....streaks! The paint had dried so quickly on the plaster bed that the talcum powder just hit dry paint - it did work in a few spots and hence the streaks. damn. Going to try it with emulsion (a cheap tester pot from B and Q) tomorrow as that shouldn't dry so quickly. Oh well.
Great fun this scenics thing though!
(oh and I found that the IKEA latte frother I had bought for 99p isn't quite up to the paint stirring I was trying to make it do - firstly the head only just fits in the can and then the end fell off into a bottle of white spirit! RIP the IKEA frother!)
Colin
Sunday, June 15, 2008
More images
The triangle got a trial coating of carpet underlay and also woodland scenics fine turf.
A few random rocks were added to the station approach board, which had been lifted into a new position the night before.
Colin
Saturday, June 14, 2008
the rocky road to success
The stream bed has been built up and banks improved to not look as 'clean and finished' as it had after its initial construction. Also the banks around the stream bridge have been built up ready for the inclusion of the wall and bridge itself (coming when Slater's deliver my plasticard order!).
The station board has also had some rocky outcrops added... and in the foreground you can see the new ramp, steps and sunken culverts.