progress is being made. The new roadway surface has been painted, the grassy area in front of it has been coloured brown underneath and received a coating of static fibres as a base layer. I have also sourced the new trees that I will install (from International Models).
Finally the 8 brass screws for the board join have been installed, the sleepers drilled to take track pins and lengths of track stripped of sleepers at the relevant sections and cut to length. The next job is to install the track with pins and solder to the screws, then the board join can be cut and electrics reattached. Then we test and then we ballast and then we're done (except for the new water tower base, but that's a small job for later).