The grassy area of the extension has been mown (using a hair trimmer) and titivated before being painted LNER Doncaster green (randomly applied with much thinners). Then a woodland scenics static grass mix was added on top, stuck on with hairspray.
The few outlying rocks have had the first few coats too.
Cork has been cut back to the correct profile and all is reading for tracklaying and electrification. I will revert to soldering to brass screws at board joins due to the shorting problems we had with copper clad strip.
Finally a new trackplan for the hidden sidings has been developed and requires two more lh points to be found.
The few outlying rocks have had the first few coats too.
Cork has been cut back to the correct profile and all is reading for tracklaying and electrification. I will revert to soldering to brass screws at board joins due to the shorting problems we had with copper clad strip.
Finally a new trackplan for the hidden sidings has been developed and requires two more lh points to be found.
No comments:
Post a Comment