Thursday, August 30, 2007

Photos of the latest progress

One side of all rails has been painted on the main station board now.

The Fridd Isaf rocks section has gained a backpiece (held on by a clamp whilst it dries) and has started to be populated by newspaper balls.

Following a suggestion in Model Rail magazine, I purchased some 'Florera' from IKEA today. This is grey coloured sand, used for decorative flower arranging etc., which is just the right scale for ballast and is just 99p for 750ml. On the left is the woodland scenics alternative, slightly darker (but negligible really) and £5.75 for 730ml!!! I have cut out a small section of plywood, glued on some cork and tomorrow will nail down a piece of track to it to act as a test piece. Both forms of ballast will be tested and I'll post the results soon....

Colin

Wednesday, August 22, 2007

Photos of progress - see for yourself!

spines are a multiplying!
The stream now has polyfilla banks
The ebay walls were delivered - not bad at all. Can't wait to try the bending in heat!

Colin

Sunday, August 19, 2007

Camera-phone - any good?

Hi,

Quite a bit of progress this weekend. I have used my new-ish camera-phone to take some images (hope they come out OK)...

The stream running just north of the main sheep creep on the Fridd Isaf curves has been cut out from the baseboard and plywood has been fixed underneath the resulting space. This is now ready for polyfilla to create the 'banks' of the stream.

Also a number of spines were cut and glued in for the rock faces and 'hill' on the Fridde iSaf board. (7, of which 3 are in two parts).

It doesn't look like that much, but it has taken loads of planning and minor tweaks to get this far...

C

The stream....

The spines with various things to hold them in place whilst glueing...

Friday, August 17, 2007

Call off the search!

Hi,

Sorry for the lack of updates, have been busy at work (and building decking in the garden). Much of the work on layout things has been searching for dry stone walling and I've found what I think will be the answer...

http://cgi.ebay.co.uk/ws/eBayISAPI.dll?ViewItem&rd=1&item=290133513059&ssPageName=STRK:MEWA:IT&ih=019

This stuff can be heated, flexed and then cooled again to shape! Brilliant! I have ordered some and will report back on how good they come out, but I'm hopeful this will save hours of DAS-ing. (which I was not looking forward to).

Also, woodland scenics appear to have launched a 'static' grass product:

http://www.ecscenics.co.uk/index.html?lang=en-uk&target=d18.html&lmd=39301.634109

This could well look good and give the grass the 3D look I need...

Anyway, back to planning...

Colin

Friday, August 03, 2007

Photos

The emulsion paint I'm using for hills - Opulence by Craig & Rose - dark chocolate.

The result - first coat on the hills...

The realigned roadway.


The rock alongside the level crossing just at the north end of the station. The scenery will come up to meet it, hence its slightly (on a piece of plywood) elevated level. Also note painted rails.

The first spine for Fridd Isaf...

Colin

Thursday, August 02, 2007

More progress than expected this week, so here's another post

Progress so far this week:

- The few edges of the modroc that were loose, were stapled down using the NETTO nail gun (see previous posts for detail of the amazing bargains available at NETTO)

- The roadway was repositioned (again) to line up with the corner of the triangular infill board, necessary due to the initial marking out of scenics on the Fridd Isaf section.

- Rail painting has continued, evening by evening and is now complete all the way to the first loop point from the Fridd Isaf end and one side of the rails have also been painted for approx half the loop.

- After much discussion and consideration, I decided to just go for it and I cut out and glued angle pieces onto the first spine for the Fridd Isaf 'hill'. Further spines should be added tomorrow.

- I hoovered (well 'Dysoned') the layout and ten mins later created loads more dust to replace that removed by the Dyson!

- I added bogies to the WHR(P) Bro Madog Eisteddfod coach, which is now available for gauging trials.

- The small trial with brown emulsion paint applied directly to modroc was successful and thus I am ready to paint it asap.

- After purchasing two more 6mm ply sheets, I cut out the backscenes for the triangular and Fridd Isaf boards. The edges of two of these were filed down to allow the boards to 'mesh' together and hide the gaps between them. There only remains one last back piece to do on the main layout - the end of the Fridd Isaf board. There are then a few bits for the hidden sidings board, but they can wait.

Photos soon...

Colin

Sunday, July 29, 2007

Water issues, painting track and loco policy

Hi,

Due to the flooding and the consequent loss of tap water for Cheltenham and the surrounding area, Mum/Dad/David took refuge at our house for the weekend. Dad brought a selection of very small painting brushes with him as I had been struggling with a 0 size brush to paint the rails. I now have a 00 and a load of other sizes too - cool! During the weekend, whilst David and I were taking a load of garden waste to the tip, Dad managed to paint the rails on the whole of the Fridd Isaf section (both sides too!). One board done then! Images tomorrow probably.

That was really the sum total of progress this week, but another issue came up in conversation, what will be the loco policy?

So, it will be as follows:

Tranche 1 (in use for the majority of the time): Modern day WHR core stock - NGG16s, K1, Russell, Funkey and any other stock used regularly on the railway (probably NG15s, Lyd and 590 in the future therefore).

Tranche 2 (from time to time amongst tranche 1 stock showing through running from FR ):
'Local' visiting locos - Taliesin, Double Fairlies, Englands, Mountaineer, Blanche, Linda, FR diesels etc

Tranche 3 (rarely and probably only when amongst friends):
Historical locos of the NWNGR/WHR non extant - Moel Tryfan/Snowdon Ranger, Beddgelert, Gowrie etc

Tranche 4 (never at exhibitions, but sometimes at home for fun):
Non FR/WHR/NWNGR engines e.g. other L+B (not Lyd), Talyllyn, Leek & Manifold etc.

Tranche 5 (almost never ever, other than for testing): Continental or freelance.

I have by no means got kits for all of these, but this is the basic policy.

Colin

Sunday, July 22, 2007

ummm...not much progress really

Week was full of travelling around - Bournemouth, Dublin, London - so little time for modelling

Weekend was full of house tasks such as gardening and the delivery of the Harry Potter book, so the only progress was in purchasing some extra M10 bolts (50mm) and wing nuts, which I have needed for some time. I also tested some emulsion paint on a corner of the dried out modroc to see if it would take ok, which, as I expected, it seems to do.

The next job is to glue down the modroc near the board join to sort the levels, continue painting the track and paint the modroc in the brown emulsion.

Colin

Sunday, July 15, 2007

Promised images

Hi,

Some images of the modroc and rail painting as promised... The first image of the board join, which is going to need some more work to build it up either side and removed the 'channel' effect.









Saturday, July 14, 2007

New regime

Week 1 of the new regime...i.e. weekly updates.

Progress this week has been on two fronts:

- The completion of modroc for the rest of the hillside behind the station, following the attachment of the second plywood backscene panel (on the 4 foot board) and the completion of the newspaper/masking tape forming system.

- Trial painting of the rails, following the purchase of a 0 sized brush and 'leather' enamel paint. It is going to be a very long job!

I should be able to post some images tomorrow when the modroc is dry...

Colin

Monday, July 09, 2007

New job...

Hi,

New job and lots of travelling has so far stopped progress on the layout. However, I hope to be able to continue moving forward, but probably not at the recent rate of progress and hence updates will now revert to once a week only.

Colin

Saturday, June 30, 2007

Between modroc and a hard place

Hi,

Firstly, due to all the fiddling about moving between jobs work on the layout has dipped recently, but normal workflow will be resumed shortly...

The first trial section of modroc was tried today. One bandage worth was placed on top of the masking tape/newspaper balls former and then sprayed with a water mister. Then the water was brushed over the top of the modroc. I have chosen this method as I feel it is least messy, will avoid over-wetting and should be more controllable. One downside is the mist did get onto the rails in some areas. These have been dried with a cloth as I didn't want anything to rust!

All the control panel parts have been moved inside and planning how this will be wired up is a priority job ahead.

Colin

Tuesday, June 26, 2007

Quick update

Some quick progress tonight:

- The lettering on my tri-ang 3mm scale bulk ore wagons was removed using the cunning method of white spirit on a cotton wool bud - it really works!

- Four 10mm holes were drilled for the triangular baseboard piece to be held onto the layout. I need to buy some more wing nuts before I can be sure of this will hold, or whether a leg will also be necessary.

- The roadway was slightly repositioned to meet the new triangular piece in the corner and to reflect the fact that the roadway is slightly narrower than I thought. Dave Kent (top man!) to measured it for me - he lives on Fridd Isaf farm.

- I bought some different masking tape from B+Q as the last roll had taken to unsticking overnight. The new stuff is different, but somehow I suspect it will also unstick. I may therefore have to finish the masking tape when I do the modroc so it doesn't have time to come unstuck!

- I started real planning for the Fridd Isaf boards, considering the heights and method of construction for this section - more soon on this...

Colin

Monday, June 25, 2007

Every triangle has three sides...

In the words of embrace http://www.embrace.co.uk/:

"Every triangle has three corners, every triangle has three sides. No more no less, you don't have to guess when its three you can see its a magic number. A man and a woman had a little baby, yes they did, they had three in the family and that's a magic number..."

anyway, the point I'm making is that the triangular piece has been put together, despite horrific rain meaning the garage wasn't really my place of choice! Images below:

To recap this is the piece that allows the backscene to make a nice angkled corner, rather than a 90 degree turn at the L shape...


Colin

Wednesday, June 20, 2007

So, what next?

Hi,

The next jobs to be completed are:
  • Calculating the number of wires that need carrying across each board join and to the control panel - this was done yesterday on the train and showed that 33 wires go between the panel and board 2 and 24 between boards 2 and 3.

  • Painting the rail sides with enamel paint (leather)

  • Completing the hillside base (awaits purchase of extra masking tape), followed by the adding of modroc over the completed hillside

  • Constructing the triangular piece on the side of the 'L' shape made by boards 4 and 5 (awaits a better mitre block)

  • Calculating the heights of scenery around Fridd Isaf and cutting out spines (calcs ongoing)

  • Wiring LEDs to control panel (a job for a rainy day)

  • Ballasting....

On this issue (ballasting), I have recently come across a new product called "Brush It On" which is available from Modellers Mecca. http://www.modellersmecca.co.uk/acatalog/Brush_It_On.html

Below is a shot of a layout (the onehouse model railway) using this product:


The following was posted on an online forum: It comes as a powder and contains particles of glue. Just mix it with water and lay it on the track. Then you have to run some cardboard along the inside of the rails to remove excess from the rails. Any remnants of ballast on the insides of the track will make itself heard as a rumbling sound when the train goes past. It takes about a day to dry after which it is rock hard. After it has dried the tops of the rails need sanding with very fine sandpaper to remove any residue.

Certianly worth getting a packet and seeing what it's like, me thinks!

One other thing ... Dad purchased 3 Tri-ang (3mm scale) bulk ore wagons for me recently (why, I hear you ask?). Well this is beacause they are pretty good candidates for conversion to 009 to act as a representation of the WHR (ex SAR) ballast wagons. With a new bogie chassis )something like this - http://www.gaugemaster.co.uk/item_details.asp?pid=12795) and some extra plasticard angle, they will do a pretty good job I reckon... Images below.



Colin

Monday, June 18, 2007

Stuffing the strut

Hi,

Is that title a Spoonerism?

First piece of interesting stuff is my Father's Day present (it's cool being a Father - you get presents thrice a year now!). Good book - full colour, hot of the press and £15 from the Ffestiniog Railway shop or via www.festshop.co.uk

Just before David left, he helped me erect the Fridd Isaf board so I can construct the triangular shaped piece mentioned before. I'v egot the wood, measured that the first side was to be 29.5 mm, got my mitre block out and then realised that the rubbish IKEA mitre block only fitted wood up to 50mm wide and this is 70mm! Will have to invest in a better one, so that job's on hold for the moment...


I then carried on stuffing between the spines with newspaper and covering it with masking tape. 3 rolls of tape have now been fully used and I've run out - with one spine left to do... I did however manage to glue the culvert in place (to the right in the photo below):

An overall shot of the layout now shows the clear 'bump' above the rock face. cool eh!

and finally a track-level view of the hillside...

Colin

Saturday, June 16, 2007

Going haywire (send three and fourpence, we're going to a dance)

Hi,

Massive progress this weekend, aided significantly by the presence of Dad and David as reinforcements [hence the title!].

So, what did we get done?

- Adding isolating joiners where isolated sections are required (with great difficulty to start with) - the tip here is to do it whilst laying the track in the first place, not afterwards!
- The re-doing of some now 'dodgy' board joins due to expansion/settling since they were first completed. Ballasting will help keep these in place!
- Filed checkrails on points to allow all stock to pass without riding up on them (a known problem with peco points).
- Glued the water tower bases down.
- Filled 6 more hillside sections with newspaper balls and held them down with masking tape
- Glued rocks alongside the stream at the base of the slope as per the prototype.
- Glued weetos box strips across parts of the hillside to create banks before merging it into the newspaper ball bits.
- Added two more spines between the two streams ready to mould that part of the landscape.
- Glued two extra locating pieces for the roof of the 90 degree board.
- Agreed that Point indicator board will now sit in the control panel to reduce the number of wires having to go back and forth from panel to layout.
- Soldered all feeds, tie overs, isolators and frogs to the track, completing all wiring at the track level. This was a massive step forward and now allows the painting of rails and ballasting to be started...

Some images are below...


Lots of wires (!) - colour coded as follows: point motor related (green), isolators (blue), feeds (yellow and red).


Massive thanks to Dad and Dave!

Colin

Monday, June 11, 2007

Fettling, nailing, filling...

Hi,

Some more shots of progress...

The sides of both traversers have been nailed on and look pretty good, if I do say so myself...

The stream area near the Waunfawr-end water tower was cut out and 6mm ply was glued below. Then the channels were formed using polyfilla and a culvert installed at the end (£2 for 2 from unit models for those interested).


The two pillars to help hold the 'roof' of the 2ft square board...

and a general view showing the 3ft board with its backscene attached. This is necessary to form the landscape, but the 4ft side next to it (nearest the camera) will wait until the newspaper forming has been finished on this section, for accessibility reasons.

Other work included having to change my jigsaw blade for the first time since this project commenced and fettling on the side of the 4ft board (just visible in the shot above) with a plane to make sure the backscene will be square when attached later.

Colin

Friday, June 08, 2007

Stream-ing

Hi,

Some great progress yesterday and tonight, tempered by a slight accident...

The two streams emanating from the side of the Waunfawr end water tower have been drawn in from photographs and jigsawed out. Two bits of 6mm ply were then cut and glued underneath, giving the streams their base and banks - easy, or so I thought!

I was just filing away the last few bits of plywood and the file slipped, pulling up 12 sleepers worth of track! The next 40 mins or so was therefore taken in stripping off sleepers, adding replacements, and tacking the track down again. In doing so it was necessary to cut the track and after a while messing around with trying to get metal rail joiners to fit (they are really difficult as found earlier), I gave up and used insulated joiners. This may actually be a good move anyway as it will allow a loco sat in the platform to be isolated, whilst perhaps another is tailed on the back...

Other progress has been the cutting out of a section of the Fridd Isaf access track/road and the gluing of it in place with a slight incline up towards the end of the board. Also 4 pieces of hardboard were cut to act as the sides of the traversers and I hope to nail these on asap.

Two pillars to help support the roof of the square board have been added, complete with extra support from two brackets and finally I bowed to pressure and cut a small strip off the 3 foot backscene piece to make the 3ft and 4ft backings the same height (as mentioned in a previous post).

Colin

Wednesday, June 06, 2007

Promised photos

A photo gallery of recent progress...


The spines all in place and glued down.


The woodland scenics road kit bought for creating the car park and track up towards Fridd Isaf farm. You stick the 'paving tape' down and spread the 'smooth-it' between the tape, before colouring.

The rock face opposite the platform has been cut out and attached to a block of wood ready for the block to be glued in place tomorrow and then the scenery to be put in place around it.

The first load of newspaper and masking tape was added [it's quite therapeutic actually!]. The section nearest the camera needs packing against the backscene board (6mm ply) and so can't be completed until that is nailed in place.
The 6mm ply for the 3ft and 4ft boards was also cut out today ready, but I may decide to finish the wiring before attaching the boards...

One corner of the 6mm ply had suffered some warping as shown, luckily I was able to get the 4ft by 1ft and 3ft by 1ft pieces out of the board without needing this warped bit. PS The B+Q boards are also not quite 2ft wide and so the two backscene boards are slightly different heights. Ummm, not sure about this B and Q place you know!

However, they can be nailed to the board at a marginally different height and so no-one will notice the difference anyway!

Colin