Tonight the wiring was taken to the next level and all is now done apart from the lighting (station lamps and signals) and I have yet to complete the cross-board connections (including the far loop point back to the DCC points decoder).

That means all feeds are in and attached to the bus bars [stapled onto the boards], isolators reconnected (not now needed for DCC!), point motors wired up (including frog connections) and connections to the points decoder.




and this is the final wiring plan: