The above shot clearly shows the wiggle, which moves left and right from the loop point onto the platform. Why am I telling you this (apart from the comedy headline?), because this has been laid today, along with the track along the north side too and the board joins between board 2 and 3 (to be soldered tomorrow). Then the platform was positioned, marked and the cork beneath it cut ready to be stripped out tomorrow (I started stripping a bit today actually). I also drilled a 10mm hole for the point motor of loop points north.