- The next piece of cork underlay was cut and glued onto the downslope(board 2), meaning the final curve up to the loop point can be sorted tomorrow.
- Pieces of copper strip cut into sleepers for the boar joins - the rails will be soldered to the copper for strength at the edges of the boards.
- Half way along the Fridd Isaf curve a couple of sleepers had become damaged, these were removed and replaced.
- More planning was done on the control panel.
Colin
No comments:
Post a Comment